Planning and Set-Up of Storage & Conveyor Techniques
Manual or automatic
With large quantities of materials to be transported, and
fixed relationships between the various steps, it makes sense
to simplify conveyor facilities as much as possible. The selection
and dimensions of such facilities must take into consideration
all economic criteria and the existing restrictions during
the entire project period.
Space limitations in production areas can lead to drastically
increased handling time and costs, and to added costs for
transport and storage (higher container quantities). Under
these circumstances, appropriate low-cost storage techniques
can open up cost-saving potentials and on the whole make production
flow more reliable.
|
 |
After calculating the anticipated logistics costs, we present
a proposal for planning and setting up efficient storage and
conveyor techniques. Key factors here are the costs to be
expected over the entire project period and ensuring the reliability
of the production process.
|
 |