Operation Cycle Analyses/ Cycle Time Calculation
This might include, for example,
the determination of personnel requirements in accordance
with the VDI (German Association of Engineers) Guideline No.
2391.
Following layout planning, it is necessary to determine personnel
requirements and floor conveyor capacities. To this end, we
carry out cycle analyses and detailed cycle time calculations,
as recommended in VDI 2391, for example.
Thus, at an early phase in the planning process, we can already
gauge the in-house logistics costs that will be incurred upon
implementation of the proposed system.
|
 |
|
 |